Constructing
a climbing wall |
|
|
|
|
Width : give it greater importance, for
it determines the largest number of participants possible : 1.20
m (4') to 1.50 m (5') wide = one route for a pair climber/belayer
|
|
Height : minimum 6 m (20')
|
|
Configuration : rather plan a vertical
wall
Slab not necessary
Plan belay positions to host training sessions (rappelling and caving,
rope climbing)
|
|
Number of protruding holds : 5 / sq. m
(5 / 10 sq. ft)
|
|
Support : whether the available support
is a concrete wall, a breeze block wall, a steel frame, timber columns
or other, there is always a possibility to adapt a corresponding
climbing wall support. The option of self-standing climbing wall
supports is also a solution.
|
|
Crash area : indoors = fold-away crash
mats / outdoors = gravel base 30 cm (1') deep
|
|
Clearance zone : 3 m (10') in front of
the largest overhang
|
|
Safety : draw a red line at a 3 m (10')
height to indicate the limit of climbing without rope belaying (traversing
mainly)
|
|
Other fittings / comfort items :
lighting = minimal intensity of 300 lux even / heating and ventilation
= temperature 16°C (60°F) to 18°C (65°F), the hot
air must not accumulate on top of the wall
|
Massy : Fire station
(France), Bourges : Fire station (France), Stuttgart : Degerloch
Fire station (Germany), Dreux : Fire station (France), Urazoe :
Okinawa prefecture's firemen school (Japan)
|
- design assistance
- advisory consulting / quotation (free of charge, no commitment)
- help for writing the technical specifications (tender document,
etc
)
- engineering & technical information (loads on support wall and
floor, information about standards, etc
)
|
| |
Pyramide 's recommendation |
 |
|
The ideal location for the bolt-on holds wall
is the fire hose drying tower
|
|
 |
|
 |
Massy (France) |
 |
Product info |
 |
|